SUBSTATION COST ESTIMATOR

  Instructions

  • Use this tool to obtain a rough cost estimate of a new substation or cost of installation of a major piece of equipment.
  • Each piece of equipment is given more than one (1) type. Why? Consider a 345kV – 138kV station, if there’s one breaker present for each voltage then (in the form to the left, under circuit breaker) pick a 345kV breaker in type 1 and 138kV for type 2.
  • Certain equipment require structural steel. For instance, a disconnect switch needs a switch stand, a CCVT needs a pedestal etc. In these instances, the steel cost is included in the cost of the equipment.

Brought to you with few ads and distractions. Please support this blog.

Substation Cost Estimator 1

Help this small blog grow - spread the word

Scroll to Top