Purpose of Gas Insulated Substation

Air has a dielectric strength of 33kV/cm. SF6 gas, on the other hand, has a dielectric strength of ~83kV/cm. Naturally, when the live parts are immersed in a pressurized gas chamber they can be placed a lot closer. Every piece of equipment (except the transformer or any other coil product) that makes up a substation can be neatly packed in an enclosed gear that is filled with SF6.

Cost of gas insulated substation

  • Single leg/bay of 138kV breaker and a half substation (not including protective relays – equipment only): ~$500,000.
  • 345kV gas-insulated bus only: ~$2,600 dollars per feet.

Lead time to procure gas insulated substation

~1 year

Information on cost and lead time is for your general knowledge only. Contact vendor with your equipment specifications for actual figures.

Learn details of other major equipment
OR
Attempt the quiz
/7
Gas Insulated Substation: Learn the Purpose, Cost, and Lead Time to Procure 1

Substation Major Equipment

It's only stupid-simple, let's begin.

For which event should a surge arrester operate? Check all that apply.
Question Image
A transformer develops an internal fault. Which device would you install on the transformer high-side to interrupt fault current?
Question Image
Which combination of devices would you use to implement power line carrier?
Question Image
What's the purpose of a conventional power transformer?
Question Image
In a distribution substation, the available ground-fault current on the low side of the step-down transformer is excessive, over-dutying the switching equipment. What is your cost-effective solution to reducing the fault current?
Question Image
An industrial facility is plagued with voltage flicker (due to harmonics) and poor power factor at the service entrance. Which device would you install to fix both issues?
Question Image
You are building an interconnect station, tying wind farm generation to the power grid. At the substation, the sources are tied through a tie-breaker. Which device would you install to make sure the sources are synchronized?
Question Image

Your score is

The average score is 40%

0%

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top